✓ RESOLVED — PLAN APPROVED

Siddhi Raj Housing Projects Private Limited

Corporate insolvency resolution — resolution plan approved · Jun 2026

Real estate & renting · private limited company · incorporated 2010 · 12 years old at admission

Sector Real Estate & Housing Bench NCLT Mumbai CIN U70100MH2010PTC209362 Admitted 02 May 2023 Initiated by OC — Capacite Infraprojects Limited Last process activity 03 Jul 2025 · claims re-verified
Acquired by
Mantra Properties and Developers Private Limited
Named in the NCLT plan-approval order dated 19 Jun 2026, reproduced as printed in that order. · read the order
Where the money went · admission → plan approval
Admitted claimsRs 154 Cr
Fair valueRs 173 Cr
Liquidation valueRs 113 Cr
Realised for creditorsRs 92 Cr
Haircut to creditors: 40.20% Recovery vs liquidation value: 81.3% In plain terms: the published plan figure provides about 60 paise per Rs 1 of admitted claims
Admitted Claims
Rs 153.82Cr
#36 of 83 in sector by size
Published plan realisable
Rs 91.99Cr
to claimants
Haircut
40.20%
sector typical 67.1%
Rec vs LV
81.3%
sector typical 120.9%
CIRP Duration
3y 1mo
sector typical 2y 1mo
Beat liquidation?
No
72% of sector did

Intelligence note

Admitted to insolvency on 02 May 2023 by the Mumbai bench, on a petition by Capacite Infraprojects Limited (an operational creditor). A resolution plan from Mantra Properties and Developers Private Limited was approved on 19 Jun 2026, 1,144 days after admission (median for resolved cases: 627 days). Creditors realise 59.80% of Rs 153.82 Cr admitted claims - a haircut of 40.2% against a median of 77.1% across resolutions. The plan is worth 81.3% of the liquidation value of Rs 113.14 Cr, below what a break-up sale was valued at.

Case details

CIN
U70100MH2010PTC209362
Incorporated
2010
Registered State
Maharashtra
NCLT Bench
Mumbai
Petition
CP(IB) No. 715 of 2021
Initiated by
OC — Capacite Infraprojects Limited
Commencement
02 May 2023
Outcome Date
19 Jun 2026
Admitted Claims
Rs 153.82 Cr
Liquidation Value
Rs 113.14 Cr
Fair Value
Rs 173.24 Cr
Realisable Amount
Rs 91.99 Cr
Recovery vs Claims
59.80%
Recovery vs LV
81.3%

NCLT Mumbai: median 553 days admission → verdict · 34% of concluded matters ended in plan approval (n=1,250, full record) · all benches →

From the plan-approval order

NCLT order of 19 Jun 2026 · full read →
Plan value, as printed
Total (Excluding CIRP Cost): 91,99,14,016
Upfront
Upfront payment of 26.50 Cr. to Secured Financial Creditors within 90 days from the Approval Date; Upfront Equity infusion within 90 days from Approval Date to acquire 100% equity shareholding
Deferred
Amount of 16 Cr. to Secured Financial Creditor within 9 months from the Approval Date; Rs 9.57 crs to Secured Financial Creditor within 12 months of Approval Date (or, at Prudent ARC's option, allotment of 12,500 Sq. Ft…
Payout horizon
CIRP Costs: within 30 days from Approval Date; Secured Financial Creditor: 90 days / 9 months / 12 months tranches; dissenting Homebuyers: 24 months from Effective Date (or up to 36 months if entitled liquidation value …
Performance security
Rs. 10,41,48,670/- aggregate (Rs. 1,00,00,000 EMD Bank Guarantee + Rs. 9,41,40,000 Performance Bank Guarantee + Rs. 8,670 balance deposited 25.05.2026), constituting 20% of the financial outlay proposed to the Secured F…
Buyer
company
Market test
2 Form G rounds · 37 EoIs · 5 plans received · negotiation ◆ an earlier plan failed
Reliefs sought
5 asked · 3 granted · 1 declined · 1 not ruled on
Contested
2 objections / queries · 3 conditions imposed by the bench

Recent movement

full timeline →
16 Jul 2023
Expressions of interest invited
RP: Amit Vijay Karia
11 Jan 2024
Expressions of interest invited
RP: Amit Vijay Karia
03 Apr 2025
Disallowed
02 Jul 2025
Others - i.a. no. 4099 of 2024 in c. p. no. 715/ib/c-v/2021
19 Jun 2026
Resolution plan approved
Acquired by Mantra Properties and Developers Private Limited
Haircut 40.20%

Valuations & recovery

Reg 35 valuations vs outcome
Fair value
Rs 173.24 Cr
Liquidation value
Rs 113.14 Cr
Recovery vs fair value
53.10%
Recovery vs liquidation value
81.3%

The plan

from the NCLT plan-approval order
Successful applicant
Mantra Properties and Developers Private Limited
CoC approval
92.97% voting share · 1st meeting · 11 Dec 2025
How the plan pays
·Total allocation excluding CIRP Cost is Rs 91,99,14,016
·CIRP Cost estimated at Rs 1,54,20,242 upto 30.11.2025, with 100% payment proposed, paid in cash within 30 days from Approval Date
·Secured Financial Creditors (Prudent ARC) to receive Rs 52,07,43,350: upfront Rs 26.50 Cr within 90 days, Rs 16 Cr within 9 months, plus Rs 9.57 crs within 12 months, or option of 12,500 sq.ft. carpet area allotment
·Homebuyers amount increased from admitted claim Rs 36,22,07,306 to Rs 39,47,55,824 per Addendum dated 06.12.2025 due to inclusion of interest component
·Upfront Equity infusion by SRA within 90 days from Approval Date to acquire 100% equity shareholding, 99.99% MPDPL and 0.01% Mr. Rohit Gupta
The resolution order · 2026-06-19

Resolution plan approved

U70100MH2010PTC209362 ·
  1. Siddhi Raj Housing Projects Pvt. Ltd.
  2. Siddhi Raj Housing Projects Private Limited

Explore the plan, creditor treatment and Tribunal directions.

Extracted order information; consult the linked order for authoritative wording. OCR and extraction can contain errors.

Read the source order ↗

19 sections · All recorded details available below

Plan funding & costs
Total plan funding, as printed
Total (Excluding CIRP Cost): 91,99,14,016
Upfront amount, as printed
Upfront payment of 26.50 Cr. to Secured Financial Creditors within 90 days from the Approval Date; Upfront Equity infusion within 90 days from Approval Date to acquire 100% equity shareholding
Deferred amount, as printed
Amount of 16 Cr. to Secured Financial Creditor within 9 months from the Approval Date; Rs 9.57 crs to Secured Financial Creditor within 12 months of Approval Date (or, at Prudent ARC's option, allotment of 12,500 Sq. Ft. Carpet Area in lieu, at Effective Date + 48 Months)
Payout horizon as printed
CIRP Costs: within 30 days from Approval Date; Secured Financial Creditor: 90 days / 9 months / 12 months tranches; dissenting Homebuyers: 24 months from Effective Date (or up to 36 months if entitled liquidation value exceeds 5%); assenting Homebuyers: delivery of flats within 48 months of Effective Date, or cash refund election within 15 days of approval paid within 12 months of Effective Date; Operational Creditors (Government Dues and Other): within 30 days of approval date
CIRP cost, as printed
Rs. 1,54,20,242 (Upto 30.11.2025)
Cirp cost treatment
100% payment towards CIRP Cost proposed, to be paid in cash within 30 days from the Approval Date; any CIRP cost remaining unpaid (inclusive of all past, present and future expenses declared by the RP up to the Approval Date) to be paid in full and in priority to any other debt out of the CD's internal accruals/cash flows, or, if insufficient, by the Resolution Applicant within 30 days from the Approval Date out of the Equity Commitment
Performance security
Rs. 10,41,48,670/- aggregate (Rs. 1,00,00,000 EMD Bank Guarantee + Rs. 9,41,40,000 Performance Bank Guarantee + Rs. 8,670 balance deposited 25.05.2026), constituting 20% of the financial outlay proposed to the Secured Financial Creditors
Performance security instrument
BG
Earnest money deposit
Rs. 1 Crore (unconditional bank guarantee, deposited 12.11.2025 at time of EOI submission)
Units note
Para 24 allocation table is headed '(Amounts in Rs. Crores)' but the printed line figures (e.g. CIRP Cost 1,54,20,242) read as absolute Rupees rather than Crores - an apparent unit-label/figure inconsistency in the source, captured verbatim. The Form-H stakeholder table is headed 'Amounts (in Rs. in Lakhs)'.
Who is owed & what the plan provides13 entries

Para 24 allocation table is headed '(Amounts in Rs. Crores)' but the printed line figures (e.g. CIRP Cost 1,54,20,242) read as absolute Rupees rather than Crores - an apparent unit-label/figure inconsistency in the source, captured verbatim. The Form-H stakeholder table is headed 'Amounts (in Rs. in Lakhs)'.

Form H · 13 rows

StakeholderClaims submittedClaims admittedPlan provisionPercentage & basis
Secured Financial CreditorsCreditors not having a right to vote under Subsection (2) of Section 21NILNILNILNIL
Secured Financial CreditorsDissentingNILNILNILNIL
Secured Financial CreditorsAssenting5210.525207.435207.4399.94%of claimed
Unsecured Financial Creditors (Homebuyers)Creditors not having a right to vote under Subsection (2) of Section 215866.845866.84NILNIL
Unsecured Financial Creditors (Homebuyers)Dissenting676.40620.98620.9891.80%of claimed
Unsecured Financial Creditors (Homebuyers)Assenting3224.213001.083326.57103.17%of claimed
Operational CreditorsGovernment2982.9634.1534.151.14%of claimed
Operational CreditorsWorkmen - PF Dues / Other DuesNILNILNANA
Operational CreditorsEmployees - PF Dues / Other DuesNANANANA
Operational CreditorsOther Operational Creditors1492.33651.8810.000.67%of claimed
Other Debts and duesNANA**NA
ShareholdersNANANANA
Total19,453.2615382.369199.1347.28%of claimed
Payment & implementation schedule9 entries
  1. Seq
    1
    Beneficiary
    CIRP Cost
    Amount as printed
    Rs. 1,54,20,242 (Upto 30.11.2025)
    Timing as printed
    within 30 days from the Approval Date
  2. Seq
    2
    Beneficiary
    Secured Financial Creditor - upfront payment
    Amount as printed
    26.50 Cr.
    Timing as printed
    within 90 days from the Approval Date
  3. Seq
    3
    Beneficiary
    Secured Financial Creditor - second tranche
    Amount as printed
    16 Cr.
    Timing as printed
    within 9 months from the Approval Date
  4. Seq
    4
    Beneficiary
    Secured Financial Creditor - balance amount (or allotment of 12,500 Sq. Ft. Carpet Area in lieu, at SFC's option)
    Amount as printed
    Rs 9.57 crs
    Timing as printed
    within 12 months of Approval Date (allotment option: Effective Date + 48 months, confirmed within 30 days of LOI)
  5. Seq
    5
    Beneficiary
    Homebuyers - Dissenting
    Amount as printed
    5% of Admitted Financial Debt (or, if higher, the entitled liquidation value)
    Timing as printed
    within 24 months from the Effective Date (or within 36 months from the Effective Date if the higher liquidation-value entitlement applies, paid in priority)
  6. Seq
    6
    Beneficiary
    Homebuyers - Assenting (delivery of flats)
    Amount as printed
    delivery of completed flats
    Timing as printed
    within 48 months of the Effective Date
  7. Seq
    7
    Beneficiary
    Homebuyers - Assenting (cash refund option, if exercised)
    Amount as printed
    full claim amount in cash
    Timing as printed
    election within 15 days from approval of the Resolution Plan; refund paid within 12 months from the Effective Date
  8. Seq
    8
    Beneficiary
    Operational Creditors (Government Dues)
    Amount as printed
    34.15 (Rs. lakhs)
    Timing as printed
    within 30 days of approval date
  9. Seq
    9
    Beneficiary
    Other Operational Creditors
    Amount as printed
    10.00 (Rs. lakhs)
    Timing as printed
    within 30 days of approval date
Resolution applicant & funding
Entity type
company
Sources of funds
Upfront Payment, part equity and/or part debt or quasi equity as per the schedule proposed in the Resolution Plan; Upfront Equity infusion within 90 days from Approval Date to acquire 100% equity shareholding; Resolution Applicant may infuse additional funds within 2-3 years of Approval Date depending on construction requirements; infusion may be in the form of Equity Instruments, Quasi Equity Instruments, or subordinated debt
Post plan management
Company to be controlled and managed by a Reconstituted Board; Directors on the Reconstituted Board to be appointed by the Monitoring Agency within 45 days of the Effective Date without shareholder/board approval; existing Board deemed resigned from that date; SRA may appoint CEO, CFO and other Key Managerial Personnel
Business & treatment of stakeholders
Statutory dues
Operational Creditors (Government Dues): claimed Rs. 29,82,96,391 (2982.96 in Rs. lakhs per Form-H), admitted Rs. 34,14,842 (34.15 lakhs), provided Rs. 34,14,842 (34.15 lakhs, 1.14% of claimed), payable within 30 days of approval date
Operational creditors
Other Operational Creditors (excluding Government Dues, workmen/employees): claimed Rs. 14,92,32,923 (1492.33 lakhs), admitted Rs. 6,51,87,682 (651.88 lakhs), provided Rs. 10,00,000 (10.00 lakhs, 0.67% of claimed), within 30 days of approval date, in priority to financial creditors per Regulation 38(1)
Workmen employees
Workmen PF Dues/Other Dues: NIL claimed/admitted, NA realisable; Employees PF Dues/Other Dues: NA/NA - no workmen or employee claims recorded
Homebuyers & allottees
Homebuyers treated as a class of Financial Creditors: dissenting homebuyers (claimed Rs. 676.40 lakhs, admitted Rs. 620.98 lakhs) to receive 5% of admitted financial debt within 24 months of the Effective Date (or, if their liquidation-value entitlement exceeds 5%, that higher amount in priority within 36 months); assenting homebuyers (claimed Rs. 3224.21 lakhs, admitted Rs. 3001.08 lakhs, provided Rs. 3326.57 lakhs after interest addendum, 103.17% of claimed) to receive delivery of flats within 48 months of the Effective Date, or may elect a full cash refund within 15 days of plan approval (paid within 12 months of the Effective Date if elected); Addendum dated 06.12.2025 increased homebuyer payout from Rs. 36,22,07,306 to Rs. 39,47,55,824 due to an added interest component of Rs. 1,51,19,915 and Rs. 1,74,28,603 for Klassic Wheels Limited and Inderchand Bhansali and others, respectively
Litigation carveout
Any contingent recovery, relief or benefit from a suit filed by the RP for transactions identified in a Transaction Audit Report under sections 43, 45, 49, 50 and 66 shall solely belong to the Resolution Applicant and form part of the CD's assets, with allocation of such recovery at the RA's discretion
Assets description
Real-estate housing project; the Corporate Debtor holds development rights over a plot owned by Pristine Buildspace Private Limited under a Development Agreement dated 03.10.2013; total area allocation to the landowner across Phase I and Phase II capped at 66,000 sq. ft. Carpet Area, assumed total sharing based on 2,20,000 sq. ft. Carpet Area minimum
Bidding, professionals & process
Interim resolution professional
Mr. Amit Vijay Karia
RP replaced the IRP
No
Invitations for expressions of interest
  1. Round no
    1
    Form g date
    2023-07-01
    Expressions of interest received
    17
    Final list count
    16
    Plans received
    2
    Outcome
    plans rejected, re-issued
  2. Round no
    2
    Form g date
    2023-12-27
    Eoi last date
    2024-01-11
    Expressions of interest received
    20
    Final list count
    20
    Plans received
    3
    Outcome
    plan approved
Applicants considered
  1. Name
    Anil Khandelwal
    Stage reached
    final_list
  2. Name
    Consortium of Eka Life Limited and The Oasis Prime Projects (India) Private Limited (Resubmission)
    Stage reached
    final_list
  3. Name
    Consortium of Ladderup Finance Limited and Lotus Spaces Private Limited (Resubmission)
    Stage reached
    final_list
    Outcome note
    Plan submitted in Round 1 (opened in 4th CoC meeting 11.10.2023); rejected by CoC in the 6th CoC meeting (20.12.2023) along with the other plan and the liquidation proposal; resubmitted for the Round 2 final list
  4. Name
    Consortium of Mr. Harsh Malhotra and Arrow Engineering Limited
    Stage reached
    plan_submitted
    Outcome note
    Plan opened and considered in 7th CoC meeting (29.02.2024); revised plan with addendum put to e-voting in the 21st CoC meeting (09-11.12.2025) alongside Mantra Properties' plan; not selected - Mantra Properties' plan was approved with 92.97% voting share
  5. Name
    Consortium of Resurgent Property Ventures Private Limited & Sanjay Lodha
    Stage reached
    final_list
  6. Name
    Garuda Construction and Engineering Limited
    Stage reached
    final_list
  7. Name
    HR Commercials Private Limited
    Stage reached
    final_list
  8. Name
    ICEM Engineering Company Private Limited (Resubmission)
    Stage reached
    final_list
    Outcome note
    Plan submitted in Round 1 (opened in 4th CoC meeting 11.10.2023); rejected by CoC in the 6th CoC meeting (20.12.2023) along with the other plan and the liquidation proposal; resubmitted for the Round 2 final list
  9. Name
    Kalyan Toll Infrastructure Limited (Resubmission)
    Stage reached
    final_list
  10. Name
    Krishna Developers Private Limited
    Stage reached
    final_list
  11. Name
    Luvkush Corporation Private Limited
    Stage reached
    final_list
  12. Name
    Mantra Properties and Developers Private Limited
    Stage reached
    approved
    Plan value as printed
    Total (Excluding CIRP Cost): 91,99,14,016
    Vote pct
    92.97%
    Outcome note
    Revised Resolution Plan with addendum approved via e-voting (09.12.2025-11.12.2025) with 92.97% voting share in the 21st CoC meeting; declared Successful Resolution Applicant; approved by the Adjudicating Authority on 19.06.2026
  13. Name
    One City Infrastructure Private Limited
    Stage reached
    final_list
  14. Name
    Purvankara Limited (Resubmission)
    Stage reached
    final_list
  15. Name
    Real Value Infotech Projects Private Limited
    Stage reached
    final_list
  16. Name
    RKG Fund I, a Scheme of RKG Trust
    Stage reached
    plan_submitted
    Outcome note
    Plan opened and considered in 7th CoC meeting (29.02.2024); with clarificatory addendum unanimously approved by CoC (100% voting) in the 14th CoC meeting (19.06.2024) and filed as IA (Plan) No. 43 of 2024 seeking AA approval; that IA was withdrawn (order dated 14.10.2025, following 16th CoC meeting resolution 04.10.2025) to allow submission of revised plans; the revised/final plan considered in the 21st CoC meeting (09.12.2025) was found contingent in nature and hence not fit for voting
  17. Name
    Sumit Kumar Khanna
    Stage reached
    final_list
  18. Name
    Suntech Realty Limited
    Stage reached
    final_list
  19. Name
    Sutlaj Sales Private Limited
    Stage reached
    final_list
  20. Name
    Treon Developers LLP, Karia Realty, Padmini Nitin Karia and Vrushali Samit Karia
    Stage reached
    final_list
Bidding mechanism
negotiation
Evaluation matrix present
Yes
Clock events
  1. Kind
    extension
    Days
    60
    Granted date
    2025-11-10
    Reason
    CIRP period extension w.e.f. 14.10.2025, per interim order in IA 5143/2025
Advisors
  1. Role
    valuer
    Name
    KKCA Valuers LLP
    Note
    Land and Building; Fair Value 174,75,27,115; Liquidation Value 124,42,47,226
  2. Role
    valuer
    Name
    iVas Partners
    Note
    Land and Building; Fair Value 170,80,00,000; Liquidation Value 101,20,00,000
  3. Role
    valuer
    Name
    Nitin Aggarwal
    Note
    Securities or Financial Assets; Fair Value 31,30,000; Liquidation Value 31,30,000
  4. Role
    valuer
    Name
    Pravin R. Navandar
    Note
    Securities or Financial Assets; Fair Value 60,97,000; Liquidation Value 33,41,000
  5. Role
    section 29A due diligence auditor
    Name
    M/s. Sanjay & Co., Chartered Accountants
    Note
    Due Diligence Report dated 24.11.2025 confirming SRA not barred under Section 29A
Composition of the committee
As of 03.07.2025 claims table: Secured Financial Creditor Prudent ARC Limited 58.98% voting share; Financial Creditors in class (Homebuyer) - Jayprakash Ramrakhiani 16.77%, Inderchand Bhansali/Kanchan Bhansali/Hitesh Bhansali/Manish Bhansali/Mehek Lucky Pamnani/Lucky Vashdev Pamnani 7.03-7.80% combined rows, Girish Rasiklal Shah 5.39%, Klassic Wheels Limited 4.03% (homebuyer-class total 41.02%); Unsecured Financial Creditor (Related Party) Aditya Birla Real Estate Fund (no voting share indicated); the Resolution Plan of Mantra Properties and Developers Private Limited was approved via e-voting open 09.12.2025 (2:00 PM) to 11.12.2025 (12:00 PM) with 92.97% voting share
Dissenting creditors
Dissenting fc treatment
Dissenting Homebuyers (Unsecured Financial Creditors): if entitled liquidation value exceeds 5% of admitted financial debt, that higher amount is paid on priority from CD cash flows before payment to assenting financial creditors, within 36 months from the Effective Date; otherwise 5% of admitted financial debt paid within 24 months from the Effective Date coinciding with amounts committed to institutional financial creditors
Section 30(2)(b) minimum stated
Yes
Ownership after resolution
Business & treatment of stakeholders
On the Approval Date, all shareholders and related shares are extinguished in full, making Mantra Properties and Developers Pvt Ltd (MPDPL) the 100% shareholder; fresh shares of face value Rs. 10 each issued to accommodate the upfront payment; MPDPL to acquire 99.99% and Mr. Rohit Gupta (Director & CEO of MPDPL) 0.01%
Capital reduction
Yes
Post plan shareholding
  1. Holder
    MPDPL and Rohit Gupta
    After
    100%
  2. Holder
    Existing Promoters
    After
    Nil and Extinguished in Full
  3. Holder
    Non Promoter Shareholders
    After
    Nil and Extinguished in Full
Implementation & monitoring
Effective date definition
The date after the Approval Date on which the order of the Adjudicating Authority is brought into full effect by release/extinguishment/deletion of any and all attachments, encumbrances, hindrances, and charges on all assets of the Corporate Debtor (especially charges/injunctions/hindrances of the High Court, Municipal Authorities, Income Tax and the like), such that the Resolution Applicant is brought into encumbrance-free, clear possession and ownership of the CD's assets including the Project land, save and except the encumbrance in favour of Secured Financial Creditors; RA expects the gap between Effective Date and Approval Date not to exceed 6 months; Clause D, Part G of the Plan states the Expected Effective Date as 90 days from the Approval Date; before the bench (30.04.2026) SRA's counsel undertook the Effective Date shall not exceed 6 months from the date of approval
Monitoring committee
Monitoring Agency to supervise implementation and review operational performance; to be constituted within 14 Business Days of the Approval Date; comprises 5 members - one nominee/representative of assenting Secured Financial Creditors, one nominee of Homebuyers, two nominees/representatives of the Resolution Applicant, and the Resolution Professional/Independent Professional, who shall be its chairman
Monitoring committee members
  1. Name
    not named
    Role
    nominee/representative of assenting Secured Financial Creditors
  2. Name
    not named
    Role
    nominee of Homebuyers
  3. Name
    not named
    Role
    nominee/representative of Resolution Applicant (1 of 2)
  4. Name
    not named
    Role
    nominee/representative of Resolution Applicant (2 of 2)
  5. Name
    Resolution Professional/Independent Professional
    Role
    Chairman of the Monitoring Agency
Reliefs requested & Tribunal decisions6 entries
  1. Seq
    1
    Relief
    Existing consents, approvals, licenses, concessions, authorizations, permits or the like granted to the CD, or applications made for renewal of the same
    Category
    licences_approvals
    Disposition
    granted
    Reason
    Approval of the Resolution Plan shall not be a ground for termination of any existing consents, approvals, licenses, concessions, authorizations, permits or the like that has been granted to the Said corporate debtor or for which the Said corporate debtor has made an application for renewal, grant permissions, sanctions, consents, approvals, allowances, exemptions etc.
  2. Seq
    2
    Relief
    Exemption from registration charges, stamp duty, taxes and fees arising out of implementation of the Resolution Plan
    Category
    stamp_duty
    Disposition
    declined
    Reason
    Any exemption as sought for in relation to the payment of registration charges, stamp duty, taxes and fees arising out of the implementation of the Resolution Plan is not granted but the Resolution Applicant is at liberty to approach Competent Authorities for the exemptions if permitted under the law.
  3. Seq
    3
    Relief
    Liability for past non-compliances/offences committed prior to commencement of CIRP
    Category
    32A
    Disposition
    32A_only
    Reason
    For past non-compliances of the said corporate debtor under applicable laws the Resolution Applicant shall not be liable for any liabilities and offences committed prior to the commencement of CIRP as stipulated under Section 32A of IBC, 2016, and subject to fulfilment of the condition therein.
  4. Seq
    4
    Relief
    Extinguishment of claims not forming part of the Resolution Plan
    Category
    other
    Disposition
    granted
    Reason
    In terms of the Judgement of the Hon'ble Supreme Court in Ghanshyam Mishra and Sons Private Limited Vs. Edelweiss Asset Reconstruction Company Limited (2021) 9 SCC 657, on the date of approval of the Resolution Plan by the Adjudicating Authority, all such claims which are not a part of the Resolution Plan shall stand extinguished and no person will be entitled to initiate or continue any proceedings in respect of a claim which is not a part of the Resolution Plan.
  5. Seq
    5
    Relief
    Benefits flowing through any other law stipulated in the Plan
    Category
    other
    Disposition
    not_adjudicated
    Reason
    If this Resolution Plan stipulates or provides for any benefit flowing through any other law, then the same may be deemed as not allowed/approved and would be open to action by the concerned authority in accordance with law.
  6. Seq
    6
    Relief
    (all reliefs, en bloc)
    Disposition
    deferred_to_authority
    Reason
    With regard to other concessions and reliefs, most of them are subsumed in the reliefs granted above. The relief included in any part of resolution plan, which is not expressly granted above, shall not be construed as granted... It is further clarified that the reliefs and concessions sought which are beyond the scope of provisions of Section 31(1) and Section 32A of the Code cannot be granted and are as such deemed to have not been granted.
Treatment of remaining reliefs
Yes
Section 32A protection
granted
Objections & their outcome2 entries
  1. Objector
    Mehek Lucky Pamnani and Lucky Vashdev Pamnani
    Objector class
    homebuyer
    Ground
    Sought consideration and verification of their claims and induction as CoC members (IA No. 4099 of 2024) while IA (Plan) No. 43 of 2024 was pending approval
    Ia number
    IA No. 4099 of 2024
    Disposition
    allowed
    Effect on approval
    Order dated 02.07.2025 directed the Applicant to consider their claims upon verification; their induction as CoC members was noted in the 16th CoC meeting (04.10.2025), where withdrawal of the pending plan-approval IA and submission of revised plans were also considered
  2. Objector
    Pristine Buildspace Private Limited (landowner)
    Objector class
    other
    Ground
    Restricted the CD's access to development land on 26.12.2023 by locking the premises, and contended that the Development Agreement dated 03.10.2013 had been terminated
    Ia number
    IA No. 224 of 2024; IA No. 1397 of 2024
    Disposition
    dismissed
    Effect on approval
    IA No. 1397 of 2024 (challenging the purported termination) was dismissed as withdrawn vide order dated 20.02.2024; the Resolution Plan proposes no payment to the landowner as an Other Creditor but delivers Area per the Development Agreement per the Delivery Schedule (Annexure B), with total area allocation to the landowner across Phase I and Phase II capped at 66,000 sq. ft. Carpet Area
Clarifications before approval3 entries
  1. Date
    2026-02-20
    What
    Bench raised a query during the hearing regarding the Provisional and Final List of PRAs; the Applicant filed an Additional Affidavit dated 02.03.2026 addressing compliance with Regulation 36A
  2. Date
    2026-04-30
    What
    Bench required the SRA's counsel to undertake that the Effective Date shall not exceed six (6) months from the date of approval of the Resolution Plan before proceeding; matter thereafter reserved for orders
  3. Date
    2026-05-13
    What
    Bench noted that the Performance Guarantee (inclusive of EMD) at Rs. 10,41,40,000/- appeared short by around Rs. 8,000/- against the required 20% of the amount proposed to be paid to Creditors; directed the Applicant/RP/SRA to examine the same, do the needful, and file an additional affidavit; listed for further consideration on 15.06.2026
Avoidance proceedings
Transaction audit findings
The Applicant submits that there are no avoidance transaction applications pending before this Tribunal, and that there are no transactions falling under Section 43, 45, 50 and 66 of the Code (para 51). The Resolution Plan proposes that any contingent recovery, relief or benefit arising from a suit filed by the RP for transactions identified in any Transaction Audit Report forming the basis of an application under section 43, 45, 49, 50 and 66 shall solely belong to the Resolution Applicant, forming part of the CD's assets, with allocation of such contingent recovery at the RA's discretion (para 52)
Tribunal findings & conditions
Conditions imposed
  1. Condition
    Effective Date shall not exceed six (6) months from the date of approval of the Resolution Plan, per the SRA counsel's undertaking recorded by the bench
    Addressed to
    SRA
  2. Condition
    Performance Security shortfall of Rs. 8,670 (against the required 20% of financial outlay to Secured Financial Creditors) to be examined and rectified; SRA deposited the shortfall on 25.05.2026, bringing the aggregate Performance Security to Rs. 10,41,48,670
    Addressed to
    SRA
  3. Condition
    Resolution Applicant directed to obtain all necessary approvals under law for the time being in force, within such period as may be prescribed, for effective implementation of the Plan
    Addressed to
    Resolution Applicant
Approval conditional on external order
No
Precedents cited
  1. Case
    K Sashidhar v. Indian Overseas Bank & Others, (2019) 12 SCC 150
    Proposition
    Once the CoC approves a Resolution Plan by the requisite voting share, the RP must submit it to the Adjudicating Authority under Section 30(6); the AA's role is 'no more and no less' than scrutiny under Section 30(2), and it cannot reject the plan on grounds outside that section
  2. Case
    Ghanshyam Mishra and Sons Private Limited Vs. Edelweiss Asset Reconstruction Company Limited, (2021) 9 SCC 657
    Proposition
    On the date of approval of the Resolution Plan, claims not forming part of the plan stand extinguished and no person may initiate or continue proceedings in respect of such claims
Judicial observations
  1. It is noted that as per RFRP, the Performance Guarantee is required to be at 20% of the amount to be paid to the Creditors. In the present case, the Performance Guarantee has been taken inclusive of EMD at Rs. 10,41,40,000/- which appears to be short by an amount of around Rs. 8,000/- as against the required 20% of the amount proposed to be paid to the Creditors. (p.17)
  2. Ld. Counsel for the SRA present during the hearing of the matter, submits and undertakes that the Effective Dates shall not exceed six (6) months from the date of approval of the Resolution Plan. Heard, Ld. Counsel for the RP, SRA, no objections have been received on behalf of any of the Creditors. The Resolution Plan has been approved with 92.97%. After hearing, matter is reserved for orders. (p.13)
Identity & order dates
Companies named in the order
  1. Siddhi Raj Housing Projects Pvt. Ltd.
  2. Siddhi Raj Housing Projects Private Limited
Order date
2026-06-19
Order reserved date
2026-04-30
Further order information
Para 24's allocation table is headed '(Amounts in Rs. Crores)' but the printed line figures (e.g. CIRP Cost Rs. 1,54,20,242) read as absolute Rupees rather than Crores - likely a mislabeled unit header in the source, captured verbatim without correction.

EoI / Form-G detail

published 11 Jan 2024
Plan submission by
18 Jan 2024
Form-G rounds — plans invited 2 times since Jul 2023
RoundForm G EoI last dateFinal PRA list Plans due
2 · latest11 Jan 202418 Jan 2024PDF
116 Jul 202331 Jul 2023PDF

Case timeline

02 May 2023
CIRP commenced
Insolvency proceedings began · NCLT Mumbai
02 May 2023
IRP
12 Jun 2023
RP
16 Jul 2023
Expressions of interest invited
RP: Amit Vijay Karia
11 Jan 2024
Expressions of interest invited
RP: Amit Vijay Karia
03 Apr 2025
Disallowed
02 Jul 2025
Others - i.a. no. 4099 of 2024 in c. p. no. 715/ib/c-v/2021
19 Jun 2026
Resolution plan approved
Acquired by Mantra Properties and Developers Private Limited
Haircut 40.20%
3 years 1 month elapsed · admission → resolution

Company

MCA master · as on 12 Jun 2026
Legal name
SIDDHI RAJ HOUSING PROJECTS PRIVATE LIMITED
Type
Private · Company limited by shares
Listing
Unlisted
Incorporated
23 Oct 2010
Authorised capital
Rs 1.17 Cr
Paid-up capital
Rs 1.17 Cr
Industry (MCA)
Real Estate and Renting
ROC
ROC Mumbai
Company status
Under CIRP
Registered address
Ground floor, Rajpipla, Opp. Standard Chartered Bank, Linking Road, Santacruz (West),,Mumbai,Mumbai City,Maharashtra,400054-India

Claims filing history

5 versions filed with IBBI · latest as on 03 Jul 2025
Creditor class Claimed Admitted Admitted %
Operational creditors Rs 229.92 Cr Rs 153.82 Cr 67%
Of Rs 229.92 Cr claimed across these classes, Rs 153.82 Cr stands admitted — 67 paise per Rs 1 claimed made it past verification.
v5 · latest
as on 03 Jul 2025 · filed by Amit Vijay Karia
v4
as on 11 Jun 2024 · filed by Amit Vijay Karia
v3
as on 08 Sep 2023 · filed by Amit Vijay Karia
v2
as on 21 Jun 2023 · filed by Amit Vijay Karia
v1
as on 16 May 2023 · filed by Amit Vijay Karia
Sources, basis and disclaimers → ·
report an error
This case vs Real Estate & Housing
Haircut40.2%
typical for this sector 67.1% · median of 81
Recovery vs liquidation value81.3%
typical for this sector 120.9% · median of 79
72% of resolutions in this sector recovered more than their liquidation value.
Time to resolution1,144 days
typical for this sector 776 days · median of 83
Size rank in sector#36 of 83
Key parties
Resolution Professional
14 IBBI mandates · 91.5% of liquidation value realised across concluded work
IRP at commencement
Amit Vijay Karia· May 2023
CIRP initiated by
Capacite Infraprojects Limited OC
Resolution applicant
Mantra Properties and Developers Private Limited
About the applicant
Mantra Properties and Developers Private Limited - mid-income housing real estate group with a strong presence in Pune, established in 2007 by Mr. Vishal Gupta; has delivered approximately 1 crore sq. ft. with a similar area under development across 15 projects, over 80% of inventory typically sold before plinth completion, supported by a team of over 430 employees and an extensive network of contractors and suppliers.

Get full access

Weekly intelligence digest, RP tracker, live case movement and sector analysis for ARCs, PE funds and resolution professionals.

Apply for access →

That was the whole dossier — nothing held back, because this company is showcased. Every company on stressed.in carries the same depth.

Or buy any single company outright for Rs 1,999 — yours permanently, and credited in full against your first month if you subscribe within 30 days.